Kitchens stall in the gaps between trades. Cabinets arrive before the floor is level. Tile goes in before the appliance dimensions are confirmed. The painter comes back three times.

What we can control is the sequence and the finish work. Carpentry, prep, paint and trim are ours, so the phases that normally slip against each other are on one schedule.

Finished kitchen with white shaker cabinets, quartz worktops, a dark fluted island, stainless double ovens and a patterned tile splashback

What's included

What the job covers

  • Demolition and disposal
  • Layout changes within existing constraints, including non-structural partition work
  • Cabinet installation, adjustment and scribing to out-of-square walls
  • Countertop coordination and templating scheduling
  • Tile and backsplash
  • Trim, toe kick, crown and filler carpentry
  • Full painting: walls, ceiling, trim and doors
  • Coordination of plumbing and electrical trades against the build sequence

What goes wrong

The problems we are actually solving

  • Cabinets that do not sit true

    Very few older kitchens here have level floors or plumb walls. Cabinets set without shimming and scribing show up later as doors that do not line up and countertop seams that open. The fix happens at install, not afterwards.

  • Phases that do not join up

    The classic kitchen delay is waiting on a trade who is waiting on a decision nobody flagged. We set decision deadlines against the build sequence up front — appliance specs, countertop template date, tile selection.

  • Living without a kitchen for longer than planned

    The realistic answer is that you will be without a kitchen for part of it. What we can do is tell you honestly how long, keep the phases tight, and not start demo until the long-lead items are actually confirmed.

  • Finish work rushed at the end

    Painting and trim get compressed when earlier phases run late, and the finish is what you look at every day. Building float into the finish phase rather than the demo phase protects it.

How it runs

Step by step

  1. 01

    Scope and constraints

    We look at what the layout will and will not allow — plumbing walls, load paths, window and door positions — before anybody draws a plan you cannot build.

  2. 02

    Selections and lead times

    Cabinets, counters, tile and appliances get locked with dates, because these are what set the schedule. Demo does not start until the long-lead items are confirmed.

  3. 03

    Demo

    Strip out and dispose, with containment and floor protection through the route to the door.

  4. 04

    Rough work

    Framing, any partition changes, and coordination of plumbing and electrical against the build sequence.

  5. 05

    Install

    Cabinets set, shimmed and scribed; counters templated and fitted; tile and backsplash.

  6. 06

    Finish

    Trim, filler and toe kick carpentry, then full paint. Walkthrough and punch list before we are done.

Workmanship

Where the time goes

  • The schedule is set by lead times, not by us

    Cabinets and countertops drive everything. We will be straight with you about what has to be decided when, because a two-week selection delay in week one is a two-week delay at the end.

  • Older kitchens need scribing

    Cabinets, fillers, toe kicks and trim all get cut to the actual walls and floor. It is slower and it is the difference between a kitchen that looks fitted and one that looks installed.

  • Finish work is not the leftover phase

    Trim and paint are the surfaces you touch and see every day. They get their own time in the schedule rather than whatever is left.

Stainless cooktop in a quartz worktop beneath a patterned star-tile splashback and a beadboard range hood
Stainless cooktop in a quartz worktop beneath a patterned star-tile splashback and a beadboard range hood

Questions

Kitchen Remodel questions

What does a full kitchen remodel include from start to finish?

Demo and disposal, any framing or partition changes, coordination of plumbing and electrical, cabinet installation, countertop templating and fit, tile, then trim carpentry and full painting, finishing with a walkthrough and punch list.

How long will I be without a kitchen?

It depends on scope and on lead times for cabinets and counters more than on our labour. We will give you a realistic phase-by-phase timeline at quoting stage rather than a best-case number — and we will not start demo until the long-lead items are confirmed.

Can you change the layout?

Within reason. Moving cabinets, changing runs and taking out non-structural partitions is usually straightforward. Relocating plumbing stacks or touching a load path is a bigger decision and we will tell you what it actually involves before it becomes a surprise.

Can I do a partial kitchen update instead?

Yes, and often it is the better call. Cabinet painting, new counters, backsplash and trim can transform a kitchen where the boxes are sound. We will tell you honestly if your existing cabinets are worth keeping.

What's the biggest mistake homeowners make?

Starting demo before selections are locked. Every delay after that point is a day you do not have a kitchen.

Free estimates

Get a price for your kitchen remodel

Send a few photos and a sentence or two about what you need. We will come back to you with next steps — and for most jobs we will want to see it in person before quoting a firm number.