EastwestPainting & Restoration

Bathroom Remodel

Bathroom Strip-Out and Structural Work

The half of a bathroom remodel that never gets photographed: tile off, walls open, floor joists exposed and the plumbing reworked before anything new goes in.

Service
Bathroom Remodel

What the photographs show

The problem. What is behind the tile decides how long the new bathroom lasts. These photographs are the stage where that gets dealt with — and the reason the same crew doing the carpentry and the finish work matters, because nothing here waits on a second contractor.

  • Wall tile stripped back to the substrate
  • Walls opened up to the studs
  • Floor lifted and joists exposed
  • New hot, cold and waste runs installed
  • Insulation renewed before closing up
  • Bathroom with the wall tile stripped back to bare substrate and the floor covering removed, the bath still in place
    Bathroom with the wall tile stripped back to bare substrate and the floor covering removed, the bath still in place
  • Bathroom opened up to the studs, showing insulation, exposed plumbing and a window opening
    Bathroom opened up to the studs, showing insulation, exposed plumbing and a window opening
  • Bathroom floor opened up to the joists, with new hot and cold runs and a waste pipe installed and a level laid across the joists
    Bathroom floor opened up to the joists, with new hot and cold runs and a waste pipe installed and a level laid across the joists
  • Bathroom walls insulated between the studs with rough plumbing run for a shower and a basin
    Bathroom walls insulated between the studs with rough plumbing run for a shower and a basin

Free estimates

Tell us about your project

Send a few photos and a sentence or two about what you need. We will come back to you with next steps — and for most jobs we will want to see it in person before quoting a firm number.

Get a free estimateCall (617) 838-1368

Mon – Sat, 7:00am – 4:00pm · Sunday closed

Call nowFree estimate